久久久噜噜久没久久久噜噜_无码人妻丰满熟妇区毛片_国产超爽人人爽人人做人人爽_色天使久久综合网天天堂

Strengthening

Location:Home>Strengthening

National Energy Shuangjiangkou Hydropower Station Intelligent Monitoring Project
2024-07-04 15:11:15

11.jpg

222.jpg

Shuangjiangkou Hydropower Station is an upstream control reservoir project for hydroelectric cascade development in the Dadu River Basin, and one of the key projects in the development of cascade power stations in the Dadu River Basin. The earth-core wall rockfill dam is 314m high, ranking first in the world of its kind. In the feasibility study stage, it is recommended that the normal storage level of the reservoir is 2500 m, the dead water level is 2330 m, the maximum dam height is 312 m, the storage capacity below the normal storage level is 3.115 billion cubic meters, and the adjusted storage capacity is 2.152 billion cubic meters. It is an annual regulating reservoir. Increase the downstream cascade power station's dry season electricity by 6.6 billion kwh and increase the guaranteed output of 1.758 million kwh.

In this project, 3 self-sensing anchor rods and 3 self-sensing anchor cables are respectively arranged at the F3 fault of the cavern spill tunnel, the lamprophyre vein of the auxiliary powerhouse, and the 3# diversion tunnel entrance slope to strengthen the three sections Surrounding rock health monitoring capabilities.


孟州市| 南部县| 灵武市| 通许县| 邵阳县| 霍林郭勒市| 红桥区| 光泽县| 大英县| 广州市| 盐津县| 临湘市| 建湖县| 防城港市| 塔河县| 望都县| 内丘县| 新安县| 盐源县| 老河口市| 凤冈县| 黑水县| 宜昌市| 溆浦县| 土默特右旗| 馆陶县| 五家渠市| 青浦区| 云和县| 页游| 彝良县| 长宁县| 合作市| 霍邱县| 齐河县| 富阳市| 德令哈市| 大化| 平潭县| 宁武县| 天峨县|