National Energy Shuangjiangkou Hydropower Station Intelligent Monitoring Project
2024-07-04 15:11:15

11.jpg

222.jpg

Shuangjiangkou Hydropower Station is an upstream control reservoir project for hydroelectric cascade development in the Dadu River Basin, and one of the key projects in the development of cascade power stations in the Dadu River Basin. The earth-core wall rockfill dam is 314m high, ranking first in the world of its kind. In the feasibility study stage, it is recommended that the normal storage level of the reservoir is 2500 m, the dead water level is 2330 m, the maximum dam height is 312 m, the storage capacity below the normal storage level is 3.115 billion cubic meters, and the adjusted storage capacity is 2.152 billion cubic meters. It is an annual regulating reservoir. Increase the downstream cascade power station's dry season electricity by 6.6 billion kwh and increase the guaranteed output of 1.758 million kwh.

In this project, 3 self-sensing anchor rods and 3 self-sensing anchor cables are respectively arranged at the F3 fault of the cavern spill tunnel, the lamprophyre vein of the auxiliary powerhouse, and the 3# diversion tunnel entrance slope to strengthen the three sections Surrounding rock health monitoring capabilities.


福清市| 泽普县| 韩城市| 孝感市| 鹤庆县| 淮阳县| 天水市| 余干县| 巨野县| 南康市| 中江县| 武强县| 恭城| 襄樊市| 昭通市| 景东| 玉田县| 温州市| 刚察县| 革吉县| 建始县| 赞皇县| 苍山县| 乌海市| 阿拉善右旗| 建阳市| 大方县| 东至县| 宜章县| 垦利县| 大方县| 平顺县| 恩平市| 柳州市| 青龙| 新密市| 牡丹江市| 嘉峪关市| 西盟| 安康市| 华容县|