久久久噜噜久没久久久噜噜_无码人妻丰满熟妇区毛片_国产超爽人人爽人人做人人爽_色天使久久综合网天天堂

Strengthening

Location:Home>Strengthening

National Energy Shuangjiangkou Hydropower Station Intelligent Monitoring Project
2024-07-04 15:11:15

11.jpg

222.jpg

Shuangjiangkou Hydropower Station is an upstream control reservoir project for hydroelectric cascade development in the Dadu River Basin, and one of the key projects in the development of cascade power stations in the Dadu River Basin. The earth-core wall rockfill dam is 314m high, ranking first in the world of its kind. In the feasibility study stage, it is recommended that the normal storage level of the reservoir is 2500 m, the dead water level is 2330 m, the maximum dam height is 312 m, the storage capacity below the normal storage level is 3.115 billion cubic meters, and the adjusted storage capacity is 2.152 billion cubic meters. It is an annual regulating reservoir. Increase the downstream cascade power station's dry season electricity by 6.6 billion kwh and increase the guaranteed output of 1.758 million kwh.

In this project, 3 self-sensing anchor rods and 3 self-sensing anchor cables are respectively arranged at the F3 fault of the cavern spill tunnel, the lamprophyre vein of the auxiliary powerhouse, and the 3# diversion tunnel entrance slope to strengthen the three sections Surrounding rock health monitoring capabilities.


安龙县| 赤壁市| 青田县| 富阳市| 海兴县| 图木舒克市| 汝阳县| 桦甸市| 新河县| 来安县| 顺义区| 满洲里市| 廉江市| 汾阳市| 屯昌县| 济南市| 鸡东县| 安平县| 察哈| 浦城县| 邹平县| 阿拉善左旗| 平果县| 涞源县| 无极县| 唐河县| 雷山县| 房产| 永修县| 鸡西市| 大丰市| 林口县| 建昌县| 松滋市| 凌云县| 玛沁县| 阿鲁科尔沁旗| 泰来县| 聂拉木县| 冀州市| 黄浦区|